PXL_20220715_194829382.PANO.jpg

ISABELLE TERRACE
PHASE 2

CHALLENGE: Controlling costs and variables in a tight, high-traffic urban area.

 

SOLUTION:

In our first collaboration with our friends at Process Architecture and Design, we have kicked off the 2022 building season with a 4-story, 28-unit apartment building that is slated to finish in December 2022.

Complete with private garages on ground floor and a rooftop garden terrace, this footprint stretches from corner to corner of a small lot in downtown Hillsboro. The build includes modern Mass Plywood Panel construction and Post-Tensioned Slab construction.

Previous
Previous

Willet Apartments

Next
Next

Isabelle Terrace